All disruptions, outages and exceptional situations
Demolition work and test blasting on Metallimiehenkuja
NCC Suomi Oy will conduct exploratory excavation, drilling and blasting work.
Short interruptions in the operation of access tags and doors
A system update will cause the access tags and doors on Otaniemi campus 16.-20.12.2024
Summer and autumn brings changes at 911±¬ÁÏÍø metro station
Renovations to 911±¬ÁÏÍø metro station will close the entrances in summer 2024
Municipal infrastructure roadworks at Otakaari and Alvarinaukio from August
Roadworks will start in Alvarinaukio square in August and continue from the intersection of Otakaari and Luolamiehentie towards Servin Maijan tie in September.
Olli Ikkala and Esa Saarinen found a common thread in baroque music and lecturing
Olli Ikkala will continue his research on nature-inspired materials and will find himself again as an organist after his busy research career. Esa Saarinen, on the other hand, continued to lecture the Philosophy and Systems Thinking (Filosofia ja systeemiajattelu) course to packed halls this spring. When they met, they discussed the organ and the atmosphere of the lectures.
Water cut in Dipoli 22 Feb at 8-15
There is a planned water cut at Dipoli (Otakaari 24) on Thursday 22nd February starting at 8.00, and it is estimated to end at 15.00.
Disruptions in water supply in Dipoli 30 Jan
The planned water outage will start at 15.00, normal working conditions in Dipoli
Resolved: Problems sending Workday's Daily Digest messages
Update 31.10.2023: Daily Digest messages are back to normal.
Suspension of electricity distribution in Maarintalo on 5 Oct
You may not stay or work in the building between 17.00 and 20.00
Anastasia Koptsyukh: I have a lot of support from the community
'Our unit is very young and dynamic. There are 15 of us in total. Our culture is vibrant, supportive, and embracing. It’s oriented towards professional growth and development.'
Studies of vibration-sensitive sites along the Jokeri Light Rail route
Measurements of vibration-sensitive sites will be carried out along the Jokeri Light Rail route between 3 and 5 May 2023. The measurements will be carried out with two trams during test runs.
When the fire alarm goes off, everyone must leave the premises of the School of Business immediately
Please use the spiral staircases to exit and take only necessary belongings with you
Opening hours of campus buildings at the turn of the year 2022
Buildings on Otaniemi campus and in Töölö have reduced opening hours at the turn of the year 2022-23.
Power outages at main building of School of Chemical Engineering on 15.8. and 22.8.
A planned power outage due to main switch maintenance at School of Chemical Engineering main building (Kemistintie 1) will last between three to five hours
Water supply renovation site in the front of A Blanc
Helsinki Region Environmental Services (HSY) water supply renovation site has moved from Rakentajanaukio area to the front of the A Blanc shopping centre.
Growth and responsibility in business discussed at the Prodeko seminar
Can business growth be responsible? How did corona change the operations of a software company? Responsibility and growth were discussed at the 2022 Prodeko seminar on 6 May.
Interruption to water supply in Otaniemi 9.5.2022
Water supply was cut before noon but returned to normal by midday
Power outage impacted activities in Otaniemi 30 March
The problem was fixed and power returned at around 13
Interruption in water supply 1st March at Rakentajanaukio 4, Otakaari 22 (TF) and Otakaari 1
Interruption in water supply 1st March at Rakentajanaukio 4, Otakaari 22 (TF) and Otakaari 1.